Difference between revisions of "Template:Next oroboros ecosystem agenda"
Line 210: | Line 210: | ||
---- | ---- | ||
* '''Jul-22 We''' Â | * '''Jul-22 We''' Â | ||
 | |||
---- | ---- | ||
* '''Jul-23 Th''' | * '''Jul-23 Th''' Â | ||
---- | ---- | ||
* '''Jul-24 Fr''' | * '''Jul-24 Fr''' Â | ||
---- | ---- | ||
* '''Jul-25 Sa''' | * '''Jul-25 Sa''' Â | ||
 2020 Week 31 |  2020 Week 31 | ||
* '''Jul-27 Mo''' Â | * '''Jul-27 Mo''' Â | ||
 | |||
---- | ---- | ||
* '''Jul-28 Tu''' | * '''Jul-28 Tu''' | ||
---- | ---- | ||
* '''Jul-29 We''' | * '''Jul-29 We''' Â | ||
---- | ---- | ||
* '''Jul-30 Th''' | * '''Jul-30 Th''' | ||
---- | ---- | ||
Line 495: | Line 495: | ||
---- | ---- | ||
* '''Nov-04 We''' | * '''Nov-04 We''' | ||
 | :::: [[Image:MITOEAGLE-logo.jpg|60px|link=http://www.mitoeagle.org/index.php/MitoEAGLE|COST Action MitoEAGLE]] <big>'''[[MitoEAGLE Summit Obergurgl 2020]]'''</big> | ||
---- | ---- | ||
* '''Nov-05 Th''' | * '''Nov-05 Th''' - [[MitoEAGLE Summit Obergurgl 2020]] | ||
---- | ---- | ||
* '''Nov-06 Fr''' | * '''Nov-06 Fr''' - [[MitoEAGLE Summit Obergurgl 2020]] | ||
* '''Nov-07 Sa''' - [[MitoEAGLE Summit Obergurgl 2020]] | |||
 2020 Week 46 |  2020 Week 46 | ||
* '''Nov-09 Mo''' Â | * '''Nov-09 Mo''' Â | ||
 | :::: [[Image:MITOEAGLE-logo.jpg|60px|link=http://www.mitoeagle.org/index.php/MitoEAGLE|COST Action MitoEAGLE]] <big>'''[[MiPschool Obergurgl 2020]]'''</big> including '''[[TRANSMIT School 2020]]''' | ||
---- | ---- | ||
* '''Nov-10 Tu''' | * '''Nov-10 Tu''' - [[MiPschool Obergurgl 2020]] including [[TRANSMIT School 2020]] | ||
---- | ---- | ||
* '''Nov-11 We''' | * '''Nov-11 We''' - [[MiPschool Obergurgl 2020]] including [[TRANSMIT School 2020]] | ||
---- | ---- |
Revision as of 11:45, 22 May 2020
- May-23 Sa
- May-24 Su
2020 Week 22
- May-25 Mo
Do you know how the "switch components" approach can help you find what is causing your O2k to not reach the quality control specifications?
Do not despair if specifications given in the O2k-Manuals are not obtained. See how to troubleshoot on your own.
- »Switch components approach«
- May-26 Tu
Remodeling of OXPHOS in prostate cancer to potentially damaging mtDNA mutations and differential expression of mt-genes
- from the O2k-Network » AT Innsbruck Gnaiger E « and » AT Innsbruck Oroboros «
- Schöpf Bernd, Weissensteiner Hansi, SchĂ€fer Georg, Fazzini Federica, Charoentong Pornpimol, Naschberger Andreas, Rupp Bernhard, Fendt Liane, Bukur Valesca, Giese Irina, Sorn Patrick, SantâAnna-Silva Ana Carolina, Iglesias-Gonzalez Javier, Sahin Ugur, Kronenberg Florian, Gnaiger Erich, Klocker Helmut (2020) OXPHOS remodeling in high-grade prostate cancer involves mtDNA mutations and increased succinate oxidation. Nat Commun 11:1487. - »Bioblast link«
- from the O2k-Network » AT Innsbruck Gnaiger E « and » AT Innsbruck Oroboros «
- May-27 We
- May-28 Th
Did you know that oxygen concentration in the O2k-Chamber can be decreased by injecting nitrogen gas?
- »Nitrogen injection«
- May-29 Fr
F1Fo-ATP synthase regulates alternative oxidase in Trypanosoma brucei
- from the O2k-Network »BR Sao Paulo Silber AM«
- Alberto LuĂ©vano-MartĂnez L, Girard RMBM, Alencar MB, Silber AM (2020) ATP regulates the activity of an alternative oxidase in Trypanosoma brucei. FEBS Lett [Epub ahead of print]. »Bioblast link«
2020 Week 23
- Jun-01 Mo
Did you know that the proper use of TIP2k-Filter Papers may avoid an unstable O2 slope neg. signal during Instrumental background correction?
- »Instrumental background« and »TIP2k Filter Papers «
- Jun-02 Tu
Remodeling pathway control of mitochondrial respiratory capacity by temperature in mouse heart: electron flow through the Q-junction in permeabilized fibers
- from the O2k-Network »AT Innsbruck Gnaiger E« , »CA Rimouski Blier PU« and »CA Edmonton Lemieux H«
- Lemieux H, Blier PU, Gnaiger E (2017) Remodeling pathway control of mitochondrial respiratory capacity by temperature in mouse heart: electron flow through the Q-junction in permeabilized fibers. Sci Rep 7:2840. »Bioblast link«
- Jun-03 We
- Jun-04 Th
Does your sample display a preference for glutamate & malate over pyruvate & malate to support NADH-linked respiration?
DatLab 7.4 provides a step-by-step guide through SUIT-008 and SUIT-014, which can be used in parallel to evaluate the contribution of different combinations of two NADH-linked respiration substrates.
-»SUIT-008« and »SUIT-014«
- Jun-05 Fr
2020 Week 24
- Jun-08 Mo
Do you know what to do when the O2k-Peltier takes longer than 20 minutes to reach the set temperature?
During air calibration, temperature of the O2k-chamber and the O2k-Peltier power can be monitored under the layout '01 Calibration show Temp'. In case of an issue with the temperature control, an error message will appear. For more information, see: - »Block temperature does not increase while heating with full power« and »DatLab error messages «
- Jun-09 Tu
- Jun-10 We
- Jun-11 Th
Did you know that some chemicals are incompatible with the Amplex UltraRed assay?
- Jun-12 Fr
2020 Week 25
- Jun-15 Mo
Did you know that when using Amplex UltraRed assay the injection of substrates and inhibitors can create artefacts in the fluorescence signal? - » Injection artefact«
- Jun-16 Tu
- Jun-17 We
- Jun-18 Th
- Jun-19 Fr
2020 Week 26
- Jun-22 Mo
Did you know how a stirrer test can save your experiments?
Get immediate information on how satisfactory your OroboPOS response time is by performing a stirrer test during air calibration.
For more information, see:
- »MitoPedia« and »Oxygen calibration - DatLab«
- Jun-23 Tu
- Jun-24 We
- Jun-25 Th
- Jun-26 Fr
2020 Week 27
- Jun-29 Mo
Find out how to evaluate the effect of the obtained âO2 slope negâ noise on experimental results
- » QC1: Oxygen sensor test«
- Jul-01 We
- Jul-02 Th
- Jul-03 Fr
- Jul-04 Sa
2020 Week 28
- Jul-06 Mo
- Jul-07 Tu
- Jul-08 We
- Jul-09 Th
- Jul-10 Fr
2020 Week 29
- Jul-13 Mo
- Jul-14 Tu
- Jul-15 We
- Jul-16 Th
- Jul-17 Fr
2020 Week 30
- Jul-20 Mo
- Jul-21 Tu
- Jul-22 We
- Jul-23 Th
- Jul-24 Fr
- Jul-25 Sa
2020 Week 31
- Jul-27 Mo
- Jul-28 Tu
- Jul-29 We
- Jul-30 Th
- Jul-31 Fr
2020 Week 32
- Aug-03 Mo
- Aug-04 Tu
- Aug-05 We
- Aug-06 Th
- Aug-07 Fr
2020 Week 33
- Aug-10 Mo
- Aug-11 Tu
- Aug-12 We
- Aug-13 Th
- Aug-14 Fr
2020 Week 34
- Aug-17 Mo
- Aug-18 Tu
- Aug-19 We
- Aug-20 Th
- Aug-21 Fr
- Aug-22 Sa
- Aug-23 Su
2020 Week 35
- Aug-24 Mo
- Aug-25 Tu
- Aug-26 We
- Aug-27 Th
- Notification to oral and poster presenters - »MitoEAGLE Summit Obergurgl 2020« (2020 Nov 04-07) and »MiPschool Obergurgl 2020« (2020 Nov 09-11)
- Aug-28 Fr
2020 Week 36
- Aug-31 Mo
- Sep-01 Tu
- Sep-02 We
- Sep-03 Th
- Sep-04 Fr
- Sep-05 Sa - Bioenergetics Vienna 2020
- Sep-06 So
- Abstract submission deadline - »ESSR 2020 Innsbruck AT«
2020 Week 37
- Sep-07 Mo
- 19:00 / 20:15 MEGA Bildungsshow - 1 Million fĂŒr Ăsterreichs Talente. MARX HALLE Wien, Karl-Farkas-Gasse 19, 1030 Wien. - »4GAMECHANGERS«
- Sep-08 Tu
- Sep-09 We
- Sep-10 Th
- »36th Congress Czech Nutrition Society 2020 Hradec Kralove CZ« (Sep 10-12)
- Sep-11 Fr
2020 Week 38
- Sep-14 Mo
- Sep-15 Tu
- Sep-16 We
- Sep-17 Th
- Sep-18 Fr
- Sep-19 Sa
- Sep-20 So
2020 Week 39
- Sep-21 Mo
- 12th ĂGMBT Annual Meeting 2020 Graz AT Sep 21-23
- Sep-22 Tu - 12th ĂGMBT Annual Meeting 2020 Graz AT
- Sep-23 We - 12th ĂGMBT Annual Meeting 2020 Graz AT
- Sep-24 Th
- 18:00 - Houska Awards 2020 Vienna - Houskapreis der B&C Privatstiftung - Verleihung des Houskapreises 2020 in Wien
- Sep-25 Fr
2020 Week 40
- Sep-28 Mo
- Sep-29 Tu - IOC Schroecken AT
- Sep-30 We - IOC Schroecken AT
- Registration and late Abstract Deadline - »MitoEAGLE Summit Obergurgl 2020« and »MiPschool Obergurgl 2020«
- Early registration deadline - »ESSR 2020 Innsbruck AT«
- Oct-01 Th - IOC Schroecken AT
- Oct-02 Fr - IOC Schroecken AT
- Oct-03 Sa - IOC Schroecken AT
2020 Week 41
- Oct-05 Mo
- Oct-06 Tu
- Oct-07 We
- Pre-Conference O2k-Workshop »MiPNet25.11 IOC148 Riga LV «
- »6th EU-Cardioprotection Meeting 2020 Riga LV« (Oct 7-9)
- Oct-08 Th - 6th EU-Cardioprotection Meeting 2020 Riga LV
- Oct-09 Fr - 6th EU-Cardioprotection Meeting 2020 Riga LV
2020 Week 42
- Oct-12 Mo
- »FAT4BRAIN School IOC147 Riga LV« (Oct 7-9)
- Oct-13 Tu
- Oct-14 We
- Oct-15 Th
- Oct-16 Fr
- Oct-18 Su
2020 Week 43
- Oct-19 Mo - ISCaM 2020 London UK
- Oct-20 Tu - ISCaM 2020 London UK
- Oct-21 We
- Oct-22 Th
- Oct-23 Fr
2020 Week 44
- Oct-26 Mo
- Oct-27 Tu
- Oct-28 We
- Oct-29 Th
- Oct-30 Fr
2020 Week 45
- Nov-02 Mo
- Nov-03 Tu
- Nov-04 We
- Nov-05 Th - MitoEAGLE Summit Obergurgl 2020
- Nov-06 Fr - MitoEAGLE Summit Obergurgl 2020
- Nov-07 Sa - MitoEAGLE Summit Obergurgl 2020
2020 Week 46
- Nov-09 Mo
- MiPschool Obergurgl 2020 including TRANSMIT School 2020
- Nov-10 Tu - MiPschool Obergurgl 2020 including TRANSMIT School 2020
- Nov-11 We - MiPschool Obergurgl 2020 including TRANSMIT School 2020
- Nov-12 Th
- Nov-13 Fr
2020 Week 47
- Nov-16 Mo
- Nov-17 Tu
- Nov-18 We
- Nov-19 Th
- Nov-20 Fr
2020 Week 48
- Nov-23 Mo
- Nov-24 Tu
- Nov-25 We
- » 2020Spring PaduaMuscleDays Padova IT / IOC Padua IT - separate registration
- Nov-26 Th
- Nov-27 Fr
- Nov-28 Sa
2020 Week 49
- Nov-30 Mo
- Dec-01 Tu
- Dec-02 We
- Dec-03 Th
- Dec-04 Fr
- Dec-05 Sa
- Dec-06 So
- Registration deadline - »ESSR 2020 Innsbruck AT«
2020 Week 50
- Dec-07 Mo
- Dec-08 Tu
- Dec-09 We
- ESSR 2020 Innsbruck AT (Dec 9-11)
- Dec-10 Th
- Dec-11 Fr
2020 Week 51
- Dec-14 Mo
- Dec-15 Tu
- Dec-16 We
- Dec-17 Th
- Dec-18 Fr
2020 Week 52
- Dec-21 Mo
- Dec-22 Tu
- Dec-23 We
- Dec-24 Th
- Dec-25 Fr
2020 Week 53
- Dec-28 Mo
- Dec-29 Tu
- Dec-30 We
- Dec-31 Th
- Jan-01 Fr